Print & Livery for Scaffolders
You are running an outdoor advertising estate. Manage it like one
Count what you actually have up
An engineer-designed complex scaffold is £8,000. An internal birdcage, £4,000. A commercial system scaffold, £1,500. A domestic tube and fitting job, £850. A chimney scaffold, £600.
A working scaffolding firm might have twelve to twenty structures standing at any moment, each up for four to eight weeks, on public roads, at three storeys, in the busiest parts of a town.
If you bought that as advertising it would be a substantial monthly spend. You already own it. The only decisions left are what goes on it, how legible it is, and whether anybody is keeping track.
That last part is where it falls down. Almost no scaffolding firm can say how many boards it has out, what condition they are in, or when they were last replaced. Boards get fitted once, left up through weather and repeated re-erection, migrate between structures, and end up grey, cracked and wired on at an angle. The estate exists; nobody is managing it.
So this is less a design job than an inventory one, which is an unusual thing to say about print and is exactly right for your trade.
The estate, item by item
Structure boards. Rigid correx or aluminium composite, roughly £15 to £25 in correx and £35 to £60 in composite, which survives several years and repeated handling rather than one season. For a firm with fifteen structures out, a working stock of thirty to forty is realistic — you need spares in every wagon.
Mesh banners for larger runs. £40 to £80 for three metres, and on a long elevation or a hoarded frontage they cover far more area than a board.
Scaffold tags and holders. A compliance item and a brand surface, read by every operative who climbs and every manager who walks the site. Printed properly with legible fields, your identity and a contact route.
Debris netting and sheeting. Where it is being used anyway, branded sheeting turns the entire elevation into your surface. It costs more per square metre than plain and it is the largest single piece of visibility available to any trade in Britain.
Vehicle livery on wagons. Cut vinyl at £350 to £700, and a scaffolding wagon is a large, slow, frequently parked vehicle in exactly the areas you want work.
Workwear and helmet decals, because your gangs are visible on structures all day and identifiable gangs read as an organised firm to any contracts manager driving past.
The ratio
An engineer-designed scaffold is £8,000. Our Booked package is £99 a month — £1,188 a year. One such job covers nearly seven years.
The estate arithmetic is the point though. Forty composite boards at £45 is £1,800, replaced perhaps every three or four years, across fifteen structures a month standing in public for six weeks each. Against a job value of £8,000 and a main-contractor relationship worth tens of thousands a year, the outlay is trivial and the exposure is continuous — provided the boards are legible, which is the thing an inventory fixes and a one-off print order does not.
What we’d actually produce
A board designed for fifty metres, high contrast, minimal detail, name and number dominant.
A stock run in a durable material, with spares distributed across the wagons so a structure never goes up bare.
A tag and holder set carrying legible fields and your identity.
A branded sheeting and banner specification for the jobs where the elevation justifies it.
An inventory and replacement schedule — how many are out, where, how old, and when they get changed. This is the part that makes the rest last.
Wagon livery, workwear and helmet decals specified as one set.
What good looks like at twelve months
- Every structure carrying a legible board from the day it goes up
- A known stock with spares in each wagon rather than a scramble
- Boards replaced on a schedule rather than when they become an embarrassment
- Tags that look like they came from a serious firm
- Contractors recognising your structures from the road, which is the entire commercial aim
The mistakes we see most
No inventory. The single reason scaffolding print decays. Nobody owns it, so nobody replaces it.
Correx on a structure that goes up thirty times. It cracks and fades. Composite costs twice as much and lasts several times as long.
Fine detail on the board. Illegible at the distance the structure is actually seen from, which is across a road.
Blank sheeting. If you are already paying to sheet an elevation, the printed version adds very little to an outlay you are making anyway, across an enormous surface.
The first ninety days
Weeks 1–4. We audit what is currently out — photographed from the road — and count what exists, what state it is in and what is missing.
Weeks 5–8. Board design and a durable stock run, distributed across the wagons with spares.
Weeks 9–12. Tags, sheeting specification, wagon livery and workwear, plus the replacement schedule that keeps it from decaying again.
At ninety days the measure is whether every structure you have standing carries a legible board. For most firms that starts the quarter at under half.
Where this lands in Gaffer
Jobs carry their address and dates, so fitting a board is a task on the erection rather than something the gang may or may not have done.
Inspection records and handover certificates issue from your own templates, which is what makes the printed tag and the emailed certificate look like the same firm.
And because repeat work groups under a company record, you can see which contractors are placing more with you as the estate improves rather than guessing.
The domestic job needs a different, much smaller set
Almost everything above is built for the commercial estate — durable boards, wagon livery, tags read by site managers. The £600 chimney job is a different business and it should not be given the same materials.
A homeowner having a chimney scaffold up for four days is not assessing whether your paperwork will survive an audit. They want to know that the structure is safe, that it will not damage the drive, when it is coming down, and who to ring if something looks wrong.
That needs three small printed items and nothing else. A plain card left with the customer carrying the erection date, the expected strike date and a number to ring. A short sheet on what to expect — access arrangements, what not to touch, what the inspection regime is, whether children and pets need keeping clear. And a lightweight board rather than a heavy composite one, because it may well not come back.
It is worth keeping this set physically separate in the wagon, because the temptation is always to hand a homeowner the commercial capability material. It is written for a contracts manager, it says nothing they care about, and it makes a four-day job feel like a construction project.
The domestic work is a small part of the turnover and a large part of how you are talked about locally. A homeowner who felt informed for four days tells their neighbours, and chimney work travels down streets exactly the way roofing does.
Questions scaffolders ask
Is branded sheeting worth the premium? On a long elevation in a busy area, it is the largest advertising surface available to any trade in the country and you are already paying for the plain version.
Correx or composite? Composite for anything reused. Correx for one-off domestic work where the board may not come back.
Who fits the boards? The gang, at erection. It takes two cable ties, which is why the spares in the wagon matter more than the design.
How often should they be replaced? Correx annually, composite every three or four years, and immediately when one is cracked or faded — which is what the inventory is for.
Get your free website review · Bigger outfit? Talk to us
See what we'd do for scaffolders
Put your website in and we'll tell you what's losing you work — speed, mobile, your Google profile, reviews and the pages you're missing. Two minutes, no call unless you want one.