Quote Systems for Plumbers
Half your work should never be quoted, and the rest never verbally
One trade, two completely different pricing problems
A bathroom refit is £1,850. A boiler replacement, £1,670. A shower installation, £840. A leak repair, £235. A blocked drain, £215.
The top half of that list and the bottom half are different businesses and they need opposite handling.
The emergency half should not be quoted at all. Somebody with water coming through a ceiling does not want a document. They want to know the callout charge, the hourly rate after it, and roughly when you can be there. Trying to price a job you have not seen, over the phone, at nine on a Sunday, produces either a number you regret or a delay that loses the call. What that half of your business needs is a published rate structure, not a quoting process.
The planned half should never be priced verbally. A £1,850 bathroom discussed on a doorstep and confirmed by text is where plumbing disputes come from. What was in the price? Was the tiling included? Who supplies the sanitaryware? Is the old suite going in a skip and whose skip?
Most plumbers run one loose approach across both, which is why the emergency calls are slower to convert than they should be and the bathrooms end in arguments more often than they should.
What each half actually needs
For emergency work: a rate structure, published. Callout in hours, callout out of hours, hourly or half-hourly rate after the first, what is included, what parts are charged at. Written on the website, stated on the phone, and confirmed by text before you set off. That last step takes twenty seconds and eliminates almost every argument about an emergency invoice.
For planned work: a specification, not a number. A bathroom quote should list what is being removed, what is being installed, who supplies which items, what the tiling covers, what happens to the waste, how long the room is out of use, and what is excluded. Two pages, not two lines.
A materials position that is unambiguous. Customer-supplied sanitaryware is the commonest source of trouble in bathroom work. State plainly whether you fit customer-supplied items, what happens if something arrives damaged, and who is responsible for the shortfall when a part is missing on day three.
Options where they help. A boiler quote with two or three models at different prices converts better than one, because the customer is choosing rather than deciding whether to proceed.
The ratio
A bathroom is £1,850. Our Seen package is £29 a month — £348 a year. One bathroom covers more than five years.
On disputes: a single bathroom that ends badly typically costs a few hundred pounds in unpaid extras, a day of arguing, and the review and referrals that job would have produced. Two of those a year is a very expensive way to save the twenty minutes a proper specification takes.
What we’d actually build
A published rate card for emergency work, including out of hours, with a confirmation text template.
A bathroom and boiler quote template carrying the specification, the exclusions and the materials position.
A tiered boiler quote format with two or three options rather than a single price.
A deposit and staged payment position for the larger planned jobs, so materials are not funded out of your own pocket.
A follow-up routine, because bathrooms are decided slowly and a proportion convert on the second contact.
What good looks like at twelve months
- Emergency callers told the rate before you set off, in writing
- No planned job over about £500 priced verbally
- A materials position that removes the customer-supplied argument
- Boiler quotes offering options rather than a single figure
- Fewer end-of-job disagreements, which is what the whole page is for
The mistakes we see most
Pricing an emergency over the phone. You have not seen it. Give the rate structure instead.
A one-line bathroom quote. It invites every argument that follows.
Saying nothing about customer-supplied items. The commonest cause of a bathroom job going wrong.
A single boiler price. Options convert better and protect your margin on the mid-tier, which is what most people choose.
The first ninety days
Weeks 1–4. The emergency rate structure written, published and turned into a confirmation text.
Weeks 5–8. The bathroom and boiler templates, with exclusions and materials positions built in.
Weeks 9–12. Tiered boiler options, deposits and staged payments, plus a follow-up prompt on planned quotes.
At ninety days the measure is whether any job over £500 went ahead without a written specification. That number should be zero.
Where this lands in Gaffer
Quote templates for bathrooms, boilers and showers hold the specification and exclusions, so a two-page document takes about the time a one-line text used to.
Emergency rates sit on the job type, which means the figure quoted on the phone is the figure that appears on the invoice.
And because installs record their date and appliance details, a boiler quoted with options is also a boiler that starts an annual service schedule the day it is fitted.
Getting paid for the visit that produces the quote
There is a category of unpaid work in this trade that quietly absorbs a day a fortnight.
Somebody rings about a bathroom or a boiler. You drive over, spend forty minutes measuring, looking at the existing pipework, working out whether the soil pipe can stay and whether the incoming main will support what they want. Then you drive home and price it. That is two hours, and a good share of those two hours produce nothing, because the person was gathering three quotes and one of them was always going to be cheaper.
There are two honest ways to handle it and most plumbers use neither.
The first is to qualify harder before driving. Photographs of the room and the boiler, the age of the property, what they are actually trying to achieve, and a stated range for that kind of job before anybody gets in a van. A proportion of people take themselves out at that point, which is the whole objective.
The second is to charge for a proper survey on the larger jobs, and offset it against the work if it goes ahead. It sounds bold and it is completely normal in adjacent trades. A £75 survey fee on a bathroom filters out the price-gatherers entirely and converts the rest at a much higher rate, because somebody who has paid for your time has already partly chosen you.
Questions plumbers ask
Should I publish my callout charge? Yes. It is the most searched and least answered question in your trade, and it removes the argument afterwards.
Do I have to quote small planned jobs in writing? Anything over a few hundred pounds, yes. Below that a confirming text with the scope in it is usually enough.
What about customer-supplied bathroom suites? Have a written position either way. The problem is ambiguity rather than the practice.
Do tiered boiler quotes not just confuse people? Two or three options, clearly different, help. Seven do not.
Get your free website review · Bigger outfit? Talk to us