Call Handling for Roofers

Your entire phone problem happens on about four days a year

Get your free website review See what we build

  • No contract
  • From £29 a month
  • First month free

Demand that arrives all at once or not at all

A full roof re-tile is £5,090. Fascias, soffits and guttering, £1,830. A flat roof in EPDM, £1,790. A repair, £505. A survey, £175.

For most of the year a roofer’s phone is manageable. A few enquiries a day, most of them planned, none of them frantic.

Then a named storm comes through overnight and the following morning the phone rings continuously from seven until dark. Three or four times a winter, and after a serious one it runs like that for two or three days.

Those days are worth an enormous amount. The callers are motivated, the work is immediate, and a large share of temporary repairs turn into full jobs later in the year. They are also the days on which most roofers answer perhaps a third of their calls, because everybody is on a roof and nobody is in an office.

That is the whole problem, and it is unusual because it is entirely predictable in nature and completely unpredictable in date. You cannot staff for it permanently. You can be ready for it.

What being ready actually means

An arrangement that can be switched on. An overflow or answering service that normally does nothing, briefed in advance, activated by a phone call the morning after the weather. Pay-per-call arrangements — roughly £1 to £1.50 a call — suit this pattern far better than a monthly retainer for a service you use six days a year.

A triage rule written before the day. Water actively coming in goes first. Loose or slipped tiles with no ingress go into a list. Cosmetic and guttering work goes into a callback queue for the following week. Without a rule, the order becomes whoever shouted loudest.

A holding message that manages expectations honestly. After a storm, saying “we are attending emergencies today, we will call everyone else back within forty-eight hours” keeps people rather than losing them. Silence loses them within the hour.

A way to capture without conversing. A form or a text-back that collects address, photograph and description, so a two-minute exchange replaces a ten-minute call.

A note of everybody you could not help. The storm surge produces far more work than you can take that week. The ones you turn away are the re-roofs you quote in March, and most roofers lose them entirely.

The ratio

A re-tile is £5,090. Our Noticed package is £49 a month — £588 a year. One re-tile covers more than eight years.

The storm arithmetic is starker. Four surge days a year, sixty to a hundred calls across them, a third currently missed. Even if only one of those missed calls was a re-tile, that is £5,090 lost to a phone nobody could get to — against a pay-per-call arrangement costing perhaps £150 across the whole winter.

What we’d actually set up

A dormant overflow arrangement, briefed with your area, your triage rule and your prices, activated by one call when the weather turns.

A storm holding message and text-back, written in advance and ready to switch on.

A capture form aimed at photographs and addresses rather than conversation.

A triage rule you and anybody answering can apply without thinking.

A follow-up list for the surge callers you could not attend, which is where a large share of the spring work comes from.

What good looks like at twelve months

  • Storm days answered rather than survived
  • A triage rule applied consistently instead of by whoever picks up
  • Callers who could not be attended captured rather than lost
  • Temporary repairs converting into full jobs later in the year
  • No monthly cost for a service you only need six days a year

The mistakes we see most

Nothing in place until the storm has already started. By the time you are arranging cover, the two best hours have gone.

A permanent answering contract for a seasonal problem. Pay-per-call fits the pattern; a retainer mostly does not.

No triage. Attending a loose ridge tile while somebody has water coming into a bedroom is how reputations get damaged in a single week.

Turning callers away without recording them. They are your March quotes and they walk off with somebody else’s number.

The first ninety days

Weeks 1–4. We work out what actually happened on the last surge — call volume, missed rate, what converted — so the plan is built on your numbers.

Weeks 5–8. The overflow arrangement, brief and triage rule set up, dormant and ready.

Weeks 9–12. Holding message, text-back and capture form written and tested, plus the follow-up list for surge callers.

At ninety days the measure is whether you could switch the whole thing on with one phone call tomorrow morning. That is the entire deliverable.

Where this lands in Gaffer

Enquiries captured during a surge land as opportunities with the address and the photographs attached, so the ones you could not attend are a list rather than a pile of notes.

Because survey and repair records sit against the property, a temporary repair made in November is visible when the same customer rings about a full re-tile in March.

And with jobs carrying dates and attendance, the triage rule is something you can check was actually followed once the week is over.

The caller who has just been frightened by somebody at the door

A particular type of call arrives regularly in this trade and it needs handling differently from every other enquiry you take.

Somebody knocks on a door, tells the homeowner their roof is in a dangerous state, offers to fix it there and then, and either takes a deposit or gets sent away. Either way the homeowner is now alarmed. A proportion of them ring a proper roofer that afternoon, which is you.

They arrive in an unusual state: worried, embarrassed, and unsure whether they are about to be taken advantage of a second time. Handled badly the call goes nowhere, because their default assumption is that every roofer is going to tell them the same frightening story.

Handled well, it is one of the best enquiries you get all month, and the handling is mostly restraint. Do not agree the roof is dangerous before seeing it. Say plainly that you will look and tell them what you find, including if the answer is that very little needs doing. Give the survey a price, or state that it is without charge, but do not oversell the urgency. And put the appointment a few days out rather than rushing, because urgency is precisely the thing that frightened them.

The roofer who takes the pressure out of that conversation wins a customer who has just learned exactly what they do not want.

Questions roofers ask

Is an answering service worth it for six days a year? On a pay-per-call basis, comfortably. On a monthly retainer, much less so, which is why the arrangement matters as much as the provider.

How do I know a storm is coming? Named storms are forecast days ahead. Switching on the day before adds no extra outlay on a pay-per-call arrangement.

What about the calls I cannot take? They get captured and called back within two days. A large share of them still book, because everybody else ignored them entirely.

Does this help outside storms? Modestly. The rest of the year your phone is manageable, which is exactly why this page is about four days.

Get your free website review · Bigger outfit? Talk to us

See what we'd do for roofers

Put your website in and we'll tell you what's losing you work — speed, mobile, your Google profile, reviews and the pages you're missing. Two minutes, no call unless you want one.

Get your free website reviewSee pricing